You are here: Home Engineering Trans Transportation Division Middle Ground Boulevard Extension from Jefferson Avenue to Warwick Boulevard
Document Actions

Middle Ground Boulevard Extension from Jefferson Avenue to Warwick Boulevard

Middle Ground Boulevard Extension from Jefferson Avenue to Warwick Boulevard, #U000-121-112, PE101, RW201, C501, B601

Project # U000-121-112, PE101, RW201, C501, B601

Description

In the mid 1980's the City developed a Strategic Transportation Plan and as a key element of that plan, the City identified the need for additional east/west connectors throughout the City. With development taking place in the middle of our city, City Council requested a project by the Virginia Department of Transportation to build a new four lane divided roadway between Warwick Boulevard and Jefferson Avenue.  This project includes a bike path for the length of the project, a bridge over the CSX railroad and will include landscaping.  A sound wall is proposed to protect the residential homes from the CSX railroad to Nettles Drive. The project will connect up the residential area west of Warwick Boulevard at the intersection of Warwick Boulevard and Maxwell Lane and Oyster Point Business Park at the intersection of Jefferson Avenue and Middle Ground Boulevard.

To Map PDF (380 KB).

Dates:
Program Resolution: 9/10/1991
Location Public Hearing:  8/31/1999
Design Public Hearing (tentative): 2/20/2010 
Design-Build Contract Award (tentative): 5/30/2011
Completion of Design-Build Contract (tentative): 6/8/2015
UPC Number: 11816
Cost: (VDOT Six-Year Improvement Program)
Preliminary Engineering: $4,352,000
Right-of-way: $25,775,000
Construction: $30,700,000
Total: $60,827,000

Status:

VDOT conducted a Field Inspection on May 24, 2001 with the first set of detailed engineering plans for the project.  Two median breaks are proposed on the Jefferson Avenue side of the project and on the Warwick Boulevard side of the project.  Project plans are being developed to the 30-50% level by VDOT with completion of the environmental document expected in early Summer 2009.  The present plan for the project is to construct it using a Design-Build process administered by VDOT.

 

City Contact:
Tom Slaughter
Department of Engineering
2400 Washington Avenue
Newport News, VA, 23607
(757) 926-8611

Translate this Site
Contact Information

Department of Engineering
8th Floor, City Hall
2400 Washington Ave
Newport News, VA  23607
Hours:  8:00 am to 5:00 pm
(757) 926-8611
(757) 926-8300 Fax
E-mail: Engineering

Architectural Construction / Asbestos / Lead / Indoor Environmental Inspection
Architectural Field Engineer
(757) 926-8113 or
(757) 926-8449

Construction Contracts Coordination
(757) 926-8611

Mapping/GIS
(757) 926-3671

Permits and Fee Collection
(757) 926-8611
(757) 926-7559 Fax

Stormwater Management / Drainage
(757) 926-8611

Civil Design
(757) 926-8611

Transportation
(757) 926-8611

Field Offices
513 Oyster Point Rd

Civil Construction Inspection
(757) 269-2470

Traffic Operations
(757) 269-2450

Citizen's Guide to Services

The Newport News Citizen’s Guide to Services has been developed to provide you with a convenient resource to access city services and programs.

Learn More