Middle Ground Boulevard Extension from Jefferson Avenue to Warwick Boulevard

Middle Ground Boulevard Extension from Jefferson Avenue to Warwick Boulevard, #U000-121-112, PE101, RW201, C501, B601, UPC 11816

Project # U000-121-112, PE101, RW201, C501, B601

Description

In the mid 1980's the City developed a Strategic Transportation Plan and as a key element of that plan, the City identified the need for additional east/west connectors throughout the City. Middle Ground Boulevard was one of those connector so City Council requested a project by the Virginia Department of Transportation to build a new four lane divided roadway between Warwick Boulevard and Jefferson Avenue.  This project includes a bike path for the length of the project, a bridge over the CSX railroad and will include landscaping.  A sound wall is proposed to protect the residential homes from the CSX railroad to Nettles Drive. Two median breaks are proposed on the Jefferson Avenue side of the project and on the Warwick Boulevard side of the project.  Three new traffic signals will be installed.  The project will connect up the residential area west of Warwick Boulevard at the intersection of Warwick Boulevard and Maxwell Lane and Oyster Point Business Park at the intersection of Jefferson Avenue and Middle Ground Boulevard.

To Map PDF (380 KB).

Dates:
Program Resolution: 9/10/1991
Location Public Hearing:  8/31/1999
Design Public Hearing:

3/17/2010

Environmental Document Approval: 8/2010
Design-Build Contract Award: 5/18/2011


Completion of Design-Build Contract: 12/15/2014
UPC Number: 11816
Cost: (VDOT Six-Year Improvement Program)
Preliminary Engineering: $2,870,000
Right-of-way: $27,028,000
Construction: $40,112,000
Total: $70,010,000

Status:

VDOT conducted a Public Hearing on March 17, 2010.  The Commonwealth Transportation Board awarded the Design-Build contract to American Infrastructure-VA, INC of Glen Allen, VA on May 18, 2011.  Notice to proceed was issued June 1, 2011.  All project plans are complete, almost all right-of-way is acquired, utility  and project construction is underway.  As of August 26, 2014, the project work was81% complete based on expenditures and 91% complete based on time.

City Contact:
VDOT Contact: American Infrastructure
Tom Slaughter
Vasilios Andreou
Department of Engineering Virginia Department of Transportation Design-Builder
2400 Washington Avenue 1700 N. Main Street

Newport News, VA 23607 Suffolk, VA 23434
Public Information
(757) 926-3665
General Newport News (757) 933-2311
(757) 925-2680 (757) 207-0510
VDOT Project Web Site with map






Translate this Site
One City Marathon

Newport News One City Marathon coming March 15, 2015

Connect with Us
Contact Information

Department of Engineering
7th Floor, City Hall
2400 Washington Ave
Newport News, VA  23607
Hours:  8:00 am to 5:00 pm
(757) 933-2311
(757) 926-8300 Fax
E-mail: 311

Construction Contracts Coordination
(757) 933-2311

Mapping/GIS
(757) 933-2311

Permits and Fee Collection
(757) 933-2311
(757) 926-7559 Fax
E-mail:  Engineering Permits

Stormwater Management / Drainage
(757) 933-2311

Civil Design
(757) 933-2311

Transportation
(757) 933-2311

Field Offices
513 Oyster Point Rd

Civil Construction Inspection
(757) 269-2471

Traffic Operations
(757) 933-2311

 

Powered by Plone CMS, the Open Source Content Management System

This site conforms to the following standards: